Over 30 years Experience!
Appointments and Booking
310.924.9537

Open Menu

Installation Gallery

We take pride in our work. This is why we go beyond industry standards when installing your equipment. It’s the extra steps we take that will keep systems running efficiently and safely for years to come, with the proper maintenance of course.

Our technicians are background checked, drug free, factory trained and NATE certified. Feel free to check them out on the Z-Team page. They will typically arrive between 7:30 and 8 to get the job started. Drop clothes and shoe covers will be used to protect your home as the old equipment is removed and disposed of and the new equipment is installed. If our installation is being done during extreme temperatures, we will provide temporary air conditioning units or heaters until your new system is operational. Once an installation is complete one of our team leaders will perform a 21-point system check and go over the system with the home owner.

How long can an installation take? A best case scenario for an installation may take a day, while more extensive work can take much longer depending on what the job calls for. Just like houses, none of the systems we install are the same; they are customized to suit the needs of the home. We may not be the fastest installers for a job, and that’s because there’s an easy way and a right way to do things.

What do you need to do to prepare for an installation? We ask that a clear path is made in the home for easier maneuverability for tools and equipment. Also, as much space around the indoor unit as possible, ideally a 4’ radius. Exterior, we again ask for a clear path and space to work. We do our best to work around foliage to prevent any unnecessary trimming. Otherwise, clean and sanitary workspaces are a must.

We do like to brag about our installs. See below for some of our work: